Design decision
Why this idea works
Combining a fire table and a projection wall gives a compact courtyard two evening modes, warmth to gather around and a screen for movie nights, with modular seating that adapts. Each element is a built system, so the gas, the wall, and the power are planned together.
- The tradeoff
- The layout sets a clear direction, but it also commits the project to fixed relationships. Coordinate the gas supply, projection power, and clearances before finishing.
- How to measure it
- Conceptual range: the courtyard field with the fire table, projection wall, and lounge planned into it.
On your property
Plan it for your site
Keep the concrete field calm so the fire and screen read cleanly, and slope the courtyard to drain. Treat the gas fire table as an installed system with clearances and supply, build the projection wall true with power run before the pour, and keep the layout flexible.
- Treat the gas fire table as a system with clearances, supply, and service.
- Build the projection wall true with power and conduit run before the pour.
- Keep the seating flexible and slope the courtyard to drain.
Before forms are set
Build implications
- Confirm before estimating Gas fire-table clearances, supply, and service.
- Confirm before estimating A true projection wall with power set before the pour.
- Confirm before estimating Flexible seating and courtyard drainage.
- Measure the site and establish elevations Record boundaries, thresholds, grade changes, utilities, and the dimensions of vehicles, furniture, equipment, or structures that affect the layout.
- Test how the space will be used Check walking routes, turning paths, door swings, working clearances, maintenance access, and the route back to the house or street.
- Resolve drainage, services, and structural support Decide where water goes and coordinate drains, conduit, irrigation, fuel, electrical work, footings, and independent supports before forms are set.
- Define and estimate each concrete element Confirm the slab or footing section, base, joints, edges, and finish, then estimate simple measurable fields separately from steps, walls, drains, and supported features.
Prevent these problems
- Starting with furniture instead of movementDining, cooking, and lounge zones need working clearances and a direct route to the house before the slab outline is fixed.
- Adding services after the pourGas, electric, water, drainage, lighting, and future conduit are easier to coordinate before concrete placement.
- Assuming the slab supports every featureRoofs, pergolas, kitchens, fireplaces, and seat walls often need separate footings or structural details.
Next step
Turn the idea into your estimate
Enter measurements from the property. The conceptual image does not provide a takeoff.
Estimate a similar concrete areaQuestions this idea raises
Can fire and a screen share a small courtyard?
Yes, if each is planned as its own system, with the fire clearances and gas supply and the projection wall and power resolved together. Coordinate them early.
How do I keep the space flexible?
Use modular seating you can rearrange for fire nights or film nights, on a calm field that suits both. Keep the fixed elements to the fire and wall.
- Best when
- Entertainment
- Reconsider when
- Reconsider the idea if circulation, utility coordination, clearances, and independent support for built features cannot be resolved on the property.
- Verify first
- Coordinate the gas supply, projection power, and clearances before finishing.
- Professional input
- Coordinate the concrete contractor with utility and feature installers before the pour
Sources and further reading
- American Concrete InstituteTechnical context for the concrete work beneath outdoor features and furniture zones.
- NRMCA CIP 6: Joints in Concrete Slabs on GradeA practical reference for planning slab panels around fixed outdoor features.
- NRMCA CIP 11: Curing In-Place ConcretePractical guidance on curing methods and timing for new exterior concrete.



