Design decision
Why this idea works
Pairing the slab path with a timber screen turns a plain side route into a private, considered passage, screening a view while the evergreens keep it green year-round. The floating slabs guide the walk cleanly along the screen.
- The tradeoff
- The layout sets a clear direction, but it also commits the project to fixed relationships. Detail the timber screen base to stay dry, and set the slabs level, before planting.
- How to measure it
- Conceptual range: each slab measured on its own, with the screen and planting figured separately.
On your property
Plan it for your site
Keep each slab even and level and set to a natural stride, and detail the timber screen to sit clear of splash so the wood can dry. Give each slab a firm base, and set the evergreens back so they soften the screen without trapping damp against it.
- Detail the timber screen base clear of splash so the wood can dry.
- Set each slab level and to a natural stride on a firm base.
- Set evergreens back so they soften the screen without trapping damp against it.
Before forms are set
Build implications
- Confirm before estimating A screen base kept clear of splash.
- Confirm before estimating Level slabs at a natural stride.
- Confirm before estimating Evergreens set back from the screen.
- Measure the site and establish elevations Record boundaries, thresholds, grade changes, utilities, and the dimensions of vehicles, furniture, equipment, or structures that affect the layout.
- Test how the space will be used Check walking routes, turning paths, door swings, working clearances, maintenance access, and the route back to the house or street.
- Resolve drainage, services, and structural support Decide where water goes and coordinate drains, conduit, irrigation, fuel, electrical work, footings, and independent supports before forms are set.
- Define and estimate each concrete element Confirm the slab or footing section, base, joints, edges, and finish, then estimate simple measurable fields separately from steps, walls, drains, and supported features.
Prevent these problems
- Following the image instead of the natural routePeople normally take the shortest comfortable path, so a decorative curve that ignores daily movement quickly becomes inconvenient.
- Losing width at pinch pointsPlanting, lights, gates, door swings, steps, and furniture can reduce a generous-looking path to an awkward passage.
- Creating a low point at a thresholdSmall elevation errors can hold water beside a door, foundation, or step even when the rest of the path drains correctly.
Next step
Turn the idea into your estimate
Enter measurements from the property. The conceptual image does not provide a takeoff.
Estimate a similar walkwayQuestions this idea raises
How do I keep a timber screen from rotting?
Detail its base to sit clear of splash and soil so water drains and the wood dries, which matters more than the wood species. Keep planting from holding damp against it.
Do the slabs need edging beside the screen?
Each slab needs a firm level base more than edging, so it stays true along the screen. Set them to a natural stride so the walk feels easy.
- Best when
- Stepping slabs
- Reconsider when
- Reconsider the idea if threshold elevations, clear width, slope, and changes in level cannot be resolved on the property.
- Verify first
- Detail the timber screen base to stay dry, and set the slabs level, before planting.
- Professional input
- Concrete contractor; accessibility review where the route must meet formal requirements
Sources and further reading
- U.S. Access Board: Building blocksAccessibility context for clear width, walking surfaces, and changes in level where applicable.
- NRMCA CIP 6: Joints in Concrete Slabs on GradeA practical starting point for panel layout and crack-control joints.
- EPA: Soak Up the Rain with Rain GardensFederal guidance for deciding whether a planted runoff area can work beside a path.



