Concrete entry steps rising to a full-height landing pedestal connected to a front walk.

Landings & entries

Landing pedestal and front walk

Concrete entry steps rising to a full-height landing pedestal connected to a front walk give a raised entry a generous platform and a clear route to the door.

Concrete entry steps rising to a full-height landing pedestal connected to a front walk.

Landings & entries

Landing pedestal and front walk

Concrete entry steps rising to a full-height landing pedestal connected to a front walk give a raised entry a generous platform and a clear route to the door.

Conceptual design image. Use it to discuss layout and priorities. Measure the property and verify drainage, utilities, slab support, local approvals, safety needs, and site conditions before building.

Design decision

Why this idea works

Where the door sits well above grade, a full landing pedestal gives a safe, generous platform to stand and open the door, and connecting it to the front walk makes the whole approach read as one route. The landing depth is what makes the raised entry comfortable and safe.

The tradeoff
The layout sets a clear direction, but it also commits the project to fixed relationships. Give the landing full depth and keep steps uniform before finishing.
How to measure it
Conceptual range: the stepped element plus the landing pedestal and the connecting front walk figured separately.

On your property

Plan it for your site

Broom-finish the treads and landing for traction and round the nosings, and keep the steps uniform up to the landing. Give the landing real depth, at least 36 inches in the direction of travel, and meet the front walk at a flush junction, pitching surfaces to drain.

  • Give the landing at least 36 inches of depth to stand and open the door safely.
  • Keep every riser and tread uniform up to the landing.
  • Meet the front walk at a flush, drained junction and set footings below frost.

Before forms are set

Build implications

  • Confirm before estimating A landing at least 36 inches deep in the direction of travel.
  • Confirm before estimating Uniform steps and footings below frost.
  • Confirm before estimating A flush, drained junction to the front walk.
  • Measure the site and establish elevations Record boundaries, thresholds, grade changes, utilities, and the dimensions of vehicles, furniture, equipment, or structures that affect the layout.
  • Test how the space will be used Check walking routes, turning paths, door swings, working clearances, maintenance access, and the route back to the house or street.
  • Resolve drainage, services, and structural support Decide where water goes and coordinate drains, conduit, irrigation, fuel, electrical work, footings, and independent supports before forms are set.
  • Define and estimate each concrete element Confirm the slab or footing section, base, joints, edges, and finish, then estimate simple measurable fields separately from steps, walls, drains, and supported features.

Prevent these problems

  • Fixing risers before final elevationsFinish layers at the landing or threshold can change the first or last riser and create an uncomfortable or unsafe flight.
  • Allowing one irregular stepUsers expect a repeated rhythm; a single different riser height or tread depth is a common trip hazard.
  • Treating open-looking stairs as ordinary flatworkCantilevered, folded, open, or suspended concrete stairs require engineered support, reinforcement, connections, and guard details.

Next step

Turn the idea into your estimate

Enter measurements from the property. The conceptual image does not provide a takeoff.

Estimate similar steps

Questions this idea raises

How deep should an entry landing be?

At least 36 inches in the direction of travel so you can stand and open the door without backing down a step, and often more for comfort. Confirm the local minimum.

Why connect the landing to the walk?

It makes the approach one continuous route to the door, and a flush junction keeps water and trip edges out. Plan the levels before finishing.

Best when
Landings & entries
Reconsider when
Reconsider the idea if finished elevations, consistent stair geometry, drainage, and safe support cannot be resolved on the property.
Verify first
Give the landing full depth and keep steps uniform before finishing.
Professional input
Qualified concrete contractor; engineer for suspended, cantilevered, or supported stairs

Sources and further reading

Read steps planning guide

Compare related ideas