Concrete entry steps and landing integrated with low brick terraced planting walls.

Finishes & details

Brick-and-concrete terraced stoop

Concrete entry steps and landing integrated with low brick terraced planting walls blend a durable concrete stair with warm brick terraces that frame the arrival.

Concrete entry steps and landing integrated with low brick terraced planting walls.

Finishes & details

Brick-and-concrete terraced stoop

Concrete entry steps and landing integrated with low brick terraced planting walls blend a durable concrete stair with warm brick terraces that frame the arrival.

Conceptual design image. Use it to discuss layout and priorities. Measure the property and verify drainage, utilities, slab support, local approvals, safety needs, and site conditions before building.

Design decision

Why this idea works

Integrating the concrete steps with low brick terraced walls gives a traditional entry warmth and layered structure, with the brick framing the climb and holding the planting. The uniform steps keep the ascent comfortable and the terraces settle the entry into the yard.

The tradeoff
The layout sets a clear direction, but it also commits the project to fixed relationships. Build the brick terraces with drainage and keep steps uniform before finishing.
How to measure it
Conceptual range: the concrete stepped element plus the brick terraced walls figured separately.

On your property

Plan it for your site

Broom-finish the concrete treads for traction and round the nosings, and build the brick terraced walls with drainage on a sound base. Keep every riser and tread uniform, detail the brick-to-concrete junction to drain, and set footings below frost.

  • Build the brick terraced walls with drainage on a sound base so they hold.
  • Keep every riser and tread uniform on the concrete steps.
  • Detail the brick-to-concrete junction to drain and set footings below frost.

Before forms are set

Build implications

  • Confirm before estimating Brick terraced walls with drainage and a sound base.
  • Confirm before estimating Uniform concrete steps within code limits.
  • Confirm before estimating A drained brick-to-concrete junction and footings below frost.
  • Measure the site and establish elevations Record boundaries, thresholds, grade changes, utilities, and the dimensions of vehicles, furniture, equipment, or structures that affect the layout.
  • Test how the space will be used Check walking routes, turning paths, door swings, working clearances, maintenance access, and the route back to the house or street.
  • Resolve drainage, services, and structural support Decide where water goes and coordinate drains, conduit, irrigation, fuel, electrical work, footings, and independent supports before forms are set.
  • Define and estimate each concrete element Confirm the slab or footing section, base, joints, edges, and finish, then estimate simple measurable fields separately from steps, walls, drains, and supported features.

Prevent these problems

  • Fixing risers before final elevationsFinish layers at the landing or threshold can change the first or last riser and create an uncomfortable or unsafe flight.
  • Allowing one irregular stepUsers expect a repeated rhythm; a single different riser height or tread depth is a common trip hazard.
  • Treating open-looking stairs as ordinary flatworkCantilevered, folded, open, or suspended concrete stairs require engineered support, reinforcement, connections, and guard details.

Next step

Turn the idea into your estimate

Enter measurements from the property. The conceptual image does not provide a takeoff.

Estimate similar steps

Questions this idea raises

Can brick terraces hold planting beside steps?

Yes, as low retaining planters with drainage and a sound base, framing the steps and holding the beds. Build them as real retaining elements.

Will the brick and concrete move apart?

Not if the junction is detailed to drain and both sit on sound bases below frost, so neither heaves. Detail the junction carefully.

Best when
Finishes & details
Reconsider when
Reconsider the idea if finished elevations, consistent stair geometry, drainage, and safe support cannot be resolved on the property.
Verify first
Build the brick terraces with drainage and keep steps uniform before finishing.
Professional input
Qualified concrete contractor; engineer for suspended, cantilevered, or supported stairs

Sources and further reading

Read steps planning guide

Compare related ideas