Modern entry with low concrete planting ribbons weaving between paved bands.

Edging & borders

Entry concrete planting ribbons

A modern entry with low concrete planting ribbons weaving between paved bands threads greenery through the approach for a crisp, contemporary arrival.

Modern entry with low concrete planting ribbons weaving between paved bands.

Edging & borders

Entry concrete planting ribbons

A modern entry with low concrete planting ribbons weaving between paved bands threads greenery through the approach for a crisp, contemporary arrival.

Conceptual design image. Use it to discuss layout and priorities. Measure the property and verify drainage, utilities, slab support, local approvals, safety needs, and site conditions before building.

Design decision

Why this idea works

Alternating bands of paving and low planting ribbons gives an entry rhythm and movement, so the approach feels designed and the greenery is woven into the walk rather than pushed to the sides. The ribbons soften the hard surface and lead the eye to the door, giving a modern, welcoming sequence.

The tradeoff
The layout sets a clear direction, but it also commits the project to fixed relationships. Keep the paved bands level and detail the ribbon drainage.
How to measure it
Conceptual range: the entry measured as paved bands plus planting ribbons, figured together.

On your property

Plan it for your site

Keep the paved bands level and evenly proportioned so the ribbons read as a deliberate rhythm, and detail the planting ribbons to drain. Choose low, tidy planting that holds the crisp lines the design depends on.

  • Keep the paved bands level and evenly proportioned for safe footing and rhythm.
  • Detail the planting ribbons to drain and establish.
  • Choose low, tidy planting that holds the crisp lines.

Before forms are set

Build implications

  • Confirm before estimating Level, evenly proportioned paved bands.
  • Confirm before estimating Draining, plantable ribbons.
  • Confirm before estimating Low, tidy planting suited to the lines.
  • Measure the site and establish elevations Record boundaries, thresholds, grade changes, utilities, and the dimensions of vehicles, furniture, equipment, or structures that affect the layout.
  • Test how the space will be used Check walking routes, turning paths, door swings, working clearances, maintenance access, and the route back to the house or street.
  • Resolve drainage, services, and structural support Decide where water goes and coordinate drains, conduit, irrigation, fuel, electrical work, footings, and independent supports before forms are set.
  • Define and estimate each concrete element Confirm the slab or footing section, base, joints, edges, and finish, then estimate simple measurable fields separately from steps, walls, drains, and supported features.

Prevent these problems

  • Calling a retaining element decorativeA wall or planter that holds soil or water needs support, reinforcement, drainage, and often professional review.
  • Hiding runoff with plantingA rain garden, swale, or planted edge must receive water intentionally and have a safe overflow route.
  • Choosing the finish before defining the jobSeat walls, planters, edging, terraces, and retaining walls may look related but carry very different loads and details.

Next step

Turn the idea into your estimate

Enter measurements from the property. The conceptual image does not provide a takeoff.

Estimate a similar concrete feature

Questions this idea raises

What are planting ribbons?

Narrow bands of low planting woven between paved bands at an entry, giving rhythm and softening the hard surface. They thread greenery into the walk itself.

Will the ribbons stay crisp?

If the planting is low and tidy and the bands are level and evenly proportioned, the design holds its crisp lines. Plant choice and even paving keep it sharp.

Best when
Edging & borders
Reconsider when
Reconsider the idea if retained soil or water, footing and reinforcement needs, drainage, and long-term access cannot be resolved on the property.
Verify first
Keep the paved bands level and detail the ribbon drainage.
Professional input
Landscape or concrete contractor; engineer for retaining or structurally loaded work

Sources and further reading

Read slab planning guide

Compare related ideas